Industrial Flooring Gold Coast & Northern Corridor

Industrial Flooring Gold Coast & Northern Corridor

When standard epoxy won't survive — hot wash-down, steel wheels, cold-room thermal cycling or static-sensitive production — we install heavy-duty urethane cement, mortar screeds and ESD systems engineered for the duty.

Call 0428 078 746
Compressive strength
Up to 85 MPa
Thermal range
-40°C to +120°C
ESD option
10⁶ – 10⁹ Ω
Thickness
4 – 9 mm
AS 4586
Slip resistance tested
HACCP
Food-grade systems
QBCC
Licensed contractor
ISO 45001
Safety systems aligned
$20M
Public liability
10 YR
System warranties

Applications

  • Cold storage & freezers
  • Breweries & beverage
  • Manufacturing plants
  • Electronics & ESD zones
  • Heavy plant maintenance

Why specify us

  • Thermal shock & hot-water resistant
  • Withstands impact & steel wheels
  • Integrated drainage falls & bunding
  • Engineered to load and duty

Our process

  1. 01Duty & load assessment
  2. 02Shot-blast & saw-cut anchoring
  3. 03Screed / falls to drains
  4. 04Urethane cement application
  5. 05Commissioning & maintenance plan

Recent projects

Industrial Flooring Systems projects

Heavy random exposure polished concrete Other Gold Coast

Other Gold Coast · Polished Concrete Flooring

Heavy random exposure polished concrete

40
Floor area
2.5
On-site
Challenge
This residential job was a heavy random exposure polished concrete. Lots of hardener was added to this slab to bring uo its integrity.
Solution
We polished it to 400 grit semi gloss finish and completed it in 2.5 days from start to finish. We sealed it with fully penetrating stain blocking sealant and then buffed it off.
Result
Amazing new fresh space for the client.
Removal of a past contractors rough installation of sealant Other Gold Coast

Other Gold Coast · Polished Concrete Flooring

Removal of a past contractors rough installation of sealant

30
Floor area
1.5
On-site
Challenge
Removal of a past contractors rough installation of sealant
Solution
Slab re polished and given the correct treatment by the team
Result
Clients love the new look.

Service areas

Local crews

FAQ

Common questions

What's the difference between epoxy and PU cement?+

PU cement tolerates thermal shock, hot wash-down and moisture far better than epoxy, making it the default for food and cold-chain.

Can you fix falls to drains?+

Yes — we screed falls and integrate drainage as part of the flooring system.

Related systems

Other services

Talk to an estimator

Quote: Industrial Flooring Systems

Fastest response is a phone call — speak directly with an estimator, not a call centre. Or send your details and we'll come back within one business day.

  • — Free site inspection for projects 100 m²+
  • — Itemised quote within 48 hours of inspection
  • — Night & weekend programs available

Phone or email required. We reply within one business day — no spam, no call centres.